Wednesday, September 06, 2006
Wed, Sep 6
Today John Lewis delivered the replacement fridge that we are pleased to report fit perfectly in the gap under the counter. Then Paul’s treadmill arrived. Two guys set it up in the second bedroom, which once decorated will become an exercise/spare bedroom. Shortly after that the furniture from IKEA arrived. Paul then spent a good hour or so fitting the legs and covering the chairs and fitted cushions. He then drove up to Tescos (grocery store) to get the ingredients he needed for Friday’s breakfast. Shortly after 4pm the electrician arrived to check out the cabling in the shed at the bottom of the back yard. He said that it was all in order and only really needed to be moved once we had replaced the roof. The flooded light fitting in the main bedroom was a different kettle of fish, though. When he took the fitting down it was still full of water. Worse though was that the fuse in the fuse-board hadn’t tripped when the water hit the live wires. Paul decided there and then it was better to be safe than sorry and arranged for the electrician to replace the whole fuse box.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment